The Forestry Forum Gallery
Over 2 decades of Forest Product images
Home
Login
Album list
Last uploads
Last comments
Most viewed
Top rated
By date
My Favorites
Search
bent
2 by 12s for stringers
ljmathias
beam on the mill
ljmathias
big Katrina log SYP
ljmathias
big SYP on mill
ljmathias
equip room wrapped
ljmathias
log pile decreasing
ljmathias
north wall wrapped
ljmathias
side wood for siding
ljmathias
top beam for bent 2
ljmathias
two posts and a beam
ljmathias
beam and siding
ljmathias
exterior beams stained
ljmathias
interior post stained
ljmathias
loft beam half sanded
ljmathias
loft beam sanded
ljmathias
side lumber siding
ljmathias
stained siding
ljmathias
two beams
ljmathias
burnt bins and table
ljmathias
burnt hill
ljmathias
burnt tools
ljmathias
east porch frame
ljmathias
melted bins
ljmathias
melted camera
ljmathias
remodeled traillight
ljmathias
west porch frame
ljmathias
beam cut for lap joint
ljmathias
beam moving onto posts
ljmathias
beam part way up
ljmathias
beam resting on scaffold
ljmathias
drill screws and driver
ljmathias
south porch frame half
ljmathias
the three saws
ljmathias
beam ready to go up
ljmathias
flat to top plates
ljmathias
north porch posts up
ljmathias
south frame lined up
ljmathias
south porch frame done
ljmathias
top plate line up
ljmathias
full truss
ljmathias
half truss
ljmathias
12 inch hand planer
ljmathias
mortise with shoulder
ljmathias
mortiser
ljmathias
post stained
ljmathias
post top for beam to set
ljmathias
replacement post
ljmathias
rough mortise in post
ljmathias
side lumber for siding trim
ljmathias
stained post
ljmathias
TF square
ljmathias
floor trusses
ljmathias
mortiser for tenon cutting
ljmathias
mortiser for tenons
ljmathias
new post mortise
ljmathias
planed vs nonplaned
ljmathias
tenon almost done
ljmathias
siding drying after seal
ljmathias
south porch done again
ljmathias
south porch fixed bases
ljmathias
south porch half fixed
ljmathias
south porch posts fixed
ljmathias
trusses arriving
ljmathias
trusses on ground
ljmathias
brace tools
ljmathias
two braces
ljmathias
brace pocket finished
ljmathias
loft beam housing
ljmathias
loft beam tenon
ljmathias
top beam in prep
ljmathias
two brace ends
ljmathias
beam fit to post
ljmathias
beam to post
ljmathias
beginng brace pocket
ljmathias
both braces fit to top beam
ljmathias
brace fitted to beam
ljmathias
brace pocket in progress
ljmathias
Jessie staining
ljmathias
loft beam fitting to post
ljmathias
manual mortiser
ljmathias
moving beam into post
ljmathias
partially stained post
ljmathias
top beam mortise
ljmathias
trimming during fit up
ljmathias
last of the north wall
ljmathias
under stairs door frame
ljmathias
entire bent lifted
ljmathias
FEL alignment tool
ljmathias
first fit up
ljmathias
forklift moving into lift
ljmathias
forklift support me aligning
ljmathias
hole hog and peg tools
ljmathias
Jessie holding up entire bent
ljmathias
Jessie sanding
ljmathias
pegs in east joints
ljmathias
95 files on 1 page(s)