drop and dry or drop and mill?

Started by ray299, October 27, 2016, 01:08:22 PM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

ray299

I'm interested in getting into post and beam construction and have a question about when to build. I've been reading both ways... drop your logs and let them dry before you saw them into timbers to be used for building to reduce the amount of shrinkage... but I've also heard if you mill them green, it's easier to mill (which I know that to be true) but also with that I've heard you should build green too so when it does dry and twist and turn, the structure is together and will all work together twisting and turning... so... timber framing... let my logs sit or mill them and build quick?

bkaimwood

I have little to no timber frame experience, but... leaving logs lay to dry works for OWB firewood applications, but not for lumber. A log will rot away to nothing long before it ever shows significant "drying"...along with significantly increased insect infestations before you've even made beams...coupled with increased, if not certain bacterial infections, which cause further degrade risks in final drying...
so I say, drop and mill!!! But oversized, for resaw after some dry time...
bk

ray299

Quote from: bkaimwood on October 27, 2016, 07:21:17 PM
I have little to no timber frame experience, but... leaving logs lay to dry works for OWB firewood applications, but not for lumber. A log will rot away to nothing long before it ever shows significant "drying"...along with significantly increased insect infestations before you've even made beams...coupled with increased, if not certain bacterial infections, which cause further degrade risks in final drying...
so I say, drop and mill!!! But oversized, for resaw after some dry time...

Makes sense... maybe there "dry" part was mentioned to after the beams were milled? I know I heard drying time one year for every inch thick outside... you got a 36" log... I'll be dead and gone before it's dried. Lol

GeneWengert-WoodDoc

Due to insect damage risk, decay risk and excessive time to dry, it is best (by far) to mill promptly and the dry the timber properly.  Often, the green timber will be put in place and then dried in place.
Gene - Author of articles in Sawmill & Woodlot and books: Drying Hardwood Lumber; VA Tech Solar Kiln; Sawing Edging & Trimming Hardwood Lumber. And more

sandsawmill14

what gene said :) always drop and saw soon as possible if you want any quality of the lumber  :)
hudson 228, lucky knuckleboom,stihl 038 064 441 magnum

TimFromNB

I have to agree. I cut some spruce logs in June and the bugs were in them when we milled on Aug 1st.

I would mill them as soon as practical.