TimberKing Sawmills



Please visit this sponsor

The Largest Inventory of Used Chainsaw Parts in the World

Toll Free 1-800-582-0470

LogRite Tools

Lucas Sawmills

Forest Products Industry Insurance

Norwood Industries Inc.

Eggimann Motor and Equipment Sales Inc.

Sawmill & Woodlot Magazine

Wood-Mizer Band Blades

Carolina Machinery Sales is a machinery dealer that specializes in the Wood Processing Industry.

Wood Processing equpment. Splitters, Processors, Conveyors

Your source for Portable Sawmills, Edgers, Resaws, Sharpeners, Setters, Bandsaw Blades and Sawmill Parts

Portable Sawmill and Planers Made by Logosol.

EZ Boardwalk Sawmills. More Saw For Less Money!

STIHLDealers.com sponsored by Northeast STIHL

Lawn-Gardening-Tools.com

Hutto Wood Products

Woodland Sawmills

Margeson Insurance

Forestry Forum Tool Box

Author Topic: need help w/ conservative dry scheduals  (Read 575 times)

0 Members and 1 Guest are viewing this topic.

Offline Jay_C

  • Member*
  • *
  • Posts: 1
  • I need to edit my profile!
need help w/ conservative dry scheduals
« on: March 12, 2004, 06:27:10 am »
 ??? I am drying my first load of  dead green white oak and made the mistake of assuming that if I followed the scheduals I would be safe.Well the first two days I lost 3% and 2.9% and developed some small checks.The books say that a very conservative schedual must be followed for the remainder of the charge but are vague on just what that means.Does anyone have any advice on the appropriate depression, temp adjustments,and safe %mc loss/day in this situation?  Thanks

Offline beenthere

  • Senior Member x2
  • *****
  • Posts: 14175
  • Location: Southern Wisconsin
  • Gender: Male
  • EIEIO
Re: need help w/ conservative dry scheduals
« Reply #1 on: March 12, 2004, 06:41:51 am »
What was the schedule that you followed that dropped the mc that much?  

Many times, with oak, the surface damage is done within hours (minutes in the sun) after sawing. If I remember right, the surface must be kept free of air movement and almost the equivalent of being sprayed with water. It is tough to avoid surface checks in the initial stages of drying oak. Then as the drying progresses, the surface checks close and are never seen again until after drying is complete, and the finishing begins.
south central Wisconsin
 It may be that my sole purpose in life is simply to serve as a warning to others

Offline Den Socling

  • Board Moderator
  • *****
  • Posts: 1769
  • Age: 61
  • Location: Pennsylvania
  • Gender: Male
  • just wondering
    • PC Specialties
Re: need help w/ conservative dry scheduals
« Reply #2 on: March 12, 2004, 07:05:20 am »
And, if the surface checks are not too deep, you won't have enough internal stress to cause problems when the core comes dry.

What are you using for a kiln? for sensors? What you need to do is keep the temperature low but keep the humidity high (wet bulb depression low).

Bake samples and watch the MC difference between shell and core.

 