In Memoriam
Gallery
Find-A-Database
Welcome,
Guest
. Please
login
or
register
.
1 Hour
1 Day
1 Week
1 Month
Forever
Login with username, password and session length
News:
BID ON A FORUM AUCTION!
Home
Help
Search
Calendar
Extras
Tool Box
Forestry Forum Dictionary
Knowledge Base
Forestry Forum Support Auctions
Login
Register
The Forestry Forum
»
Forum
»
General Forestry
»
Drying and Processing
(Moderator:
Den Socling
) »
You Kiln Guys Got It All Wrong
Forestry Forum Tool Box
« previous
next »
Print
Pages: [
1
]
Go Down
Author
Topic: You Kiln Guys Got It All Wrong (Read 1793 times)
0 Members and 1 Guest are viewing this topic.
Fla._Deadheader
Senior Member x2
Posts: 10147
Age: 68
Gender:
Linda Vista, Costa Rica
You Kiln Guys Got It All Wrong
«
on:
December 19, 2004, 03:31:58 pm »
Ed and I were watching a "Home Improvement" show this morning. It was chock full of REAL smart folks that have ALL the answers to what material to use for whatever project. Best thing we heard was, " When you choose solid wood for flooring, make sure the moisture content is at 15% or a LITTLE lower. This makes for the best installation and is easy to work with".
How come Y'all keep sayin that the wood needs to be around 8% and then acclimated
Logged
All truth passes through three stages:
First, it is ridiculed;
Second, it is violently opposed; and
Third, it is accepted as self-evident.
-- Arthur Schopenhauer (1788-1860)
Ianab
Administrator
Posts: 5294
Age: 49
Location: Stratford , New Zealand
Gender:
Marmite on toast is a real breakfast
Re: You Kiln Guys Got It All Wrong
«
Reply #1 on:
December 19, 2004, 07:47:45 pm »
I think it depends where and how your house is built.
If you are living inland in the States with central heating and air-con all year round, wood inside your house is going to settle to around 8%.
If you live in NZ without central heating or air-con wood in the house settles to 12-14%. So I can use 15% timber inside with few problems. Some guy living in Arizona still has a lot of drying to do
This article has a chart on page 6 that lets you work out what the equlibrium moisture content is for different temps and humidity.
http://www.woodweb.com/knowledge_base_images/zp/equilibrium_moisture_content.pdf
Sitting here now I can see my inside temp is 20C and humidity is 70%. EMC is 12.8 %. This is approx what wood settles to, I've checked with oven dry samples and digital scales.
If I was sitting in a centraly heated house in the US winter, humidity probably 30%?, EMC would be 6.2 %
Your mileage may vary
Ian
Logged
Weekend warrior, Peterson 8" WPF with Stihl 090 powerhead, Dolmar 7900 and Stihl MS310 saws and the usual collection of power tools
DanG
Senior Member x2
Posts: 11923
Age: 65
Location: Chattahoochee, Florida USA
Gender:
DanG, The Official ForestryForum Cussword
Re: You Kiln Guys Got It All Wrong
«
Reply #2 on:
December 19, 2004, 08:50:11 pm »
Those home improvement shows are fun, and can be informative. I get a lot of good ideas from them, and learn some techniques, but some of those guys "know" just a little too much to be credible.
Logged
"I don't feel like an old man. I feel like a young man who has something wrong with him." Dick Cavett
"Beat not thy sword into a plowshare, rather beat the sword of thine enemy into a plowshare."
WV_hillbilly
Senior Member
Posts: 819
Age: 42
Gender:
Work can be shocking at times . Bellaire , OH
Re: You Kiln Guys Got It All Wrong
«
Reply #3 on:
December 19, 2004, 10:42:40 pm »
Plus those shows give the wives too many ideas . I think it's the big box stores subliminal advertising . They are a sneaky lot .
Logged
Hillbilly
Fla._Deadheader
Senior Member x2
Posts: 10147
Age: 68
Gender:
Linda Vista, Costa Rica
Re: You Kiln Guys Got It All Wrong
«
Reply #4 on:
December 20, 2004, 04:10:22 am »
Yeah, see, Ole Lan took me a little tooooooo seriously with this post. Hey Lan, Lighten up, Buddy.
I love when these folks get a project started, and they work themselves into a real problem. Suddenly, "Let's take a break" and when they come back, everything is perfect
Y'all ever watch that show where folks trade houses and re-decorate
I think mass murder is in order, sometimes.
No WAY would someone take my place and paint the walls Blue, and Red and hang some of that cloth crap over the winders, like it blew in through the winder and stuck fast.
I guess that's why it's called "Entertainment".
Logged
All truth passes through three stages:
First, it is ridiculed;
Second, it is violently opposed; and
Third, it is accepted as self-evident.
-- Arthur Schopenhauer (1788-1860)
Ianab
Administrator
Posts: 5294
Age: 49
Location: Stratford , New Zealand
Gender:
Marmite on toast is a real breakfast
Re: You Kiln Guys Got It All Wrong
«
Reply #5 on:
December 20, 2004, 02:59:46 pm »
Merry Christmas* Harold
I might change my name to Lan to Toolman
And I do know what you mean about those 'makeover' shows. Last one I saw this decorator consultant looks at it and says... 'this old wood panelling has to go - we can paint over that with "satin eggshell" and it will look much better'
I turned the TV off about that point, and went to dress some of my Air Dried cypruss to replace some painted wall in my lounge
Logged
Weekend warrior, Peterson 8" WPF with Stihl 090 powerhead, Dolmar 7900 and Stihl MS310 saws and the usual collection of power tools
Fla._Deadheader
Senior Member x2
Posts: 10147
Age: 68
Gender:
Linda Vista, Costa Rica
Re: You Kiln Guys Got It All Wrong
«
Reply #6 on:
December 20, 2004, 03:51:39 pm »
Spot on, Mate.
Logged
All truth passes through three stages:
First, it is ridiculed;
Second, it is violently opposed; and
Third, it is accepted as self-evident.
-- Arthur Schopenhauer (1788-1860)
sawmillsi
Full Member x2
Posts: 209
Age: 33
Location: northern nsw, australia
Gender:
workin hard
Re: You Kiln Guys Got It All Wrong
«
Reply #7 on:
January 13, 2005, 12:03:54 am »
Hi guys
I just recently discovered how much of a load of u know what those home renovation shows are.
We built our mum and dad a gazebo (about 21' x 12' all out of good solid australian hardwood, including australian hardwood shakes that I split) and paved about 150m2 (I think thats about 4200 square feet).
We had licenced builders, roofers and plumers and an experienced paver and it still took us 7 days from dawn to dusk. And boy did we go hard.
I'll find some pics and post them.
I swear I'll never pave again - concrete from here on in!
Si
Logged
Print
Pages: [
1
]
Go Up
« previous
next »
The Forestry Forum
»
Forum
»
General Forestry
»
Drying and Processing
(Moderator:
Den Socling
) »
You Kiln Guys Got It All Wrong
Saw Anywhere!