My buddy has a shed built with pine poles, been in ground for 30 years. NO ROT AT ALL. Dug hole 2 foot deeper than desired, filled to post hight with gravel. Soaked pole ends in mixture of diesel and old oil before concreting over the gravel. Ofcoarse I don't think the EPA would approve.